K-12 Education
Facilities
Indian Ridge Middle School
Agency:
Broward County Public Schools
Year Completed:
2019
Scope of work:
This project involved renovating art and music rooms, replacing fume hoods, doors, gas piping, and painting the exterior campus. MEP upgrades included installing two cooling towers and replacing 20 heat pumps. Re-roofing over 197,024 SF with a new SBS-modified Bitumen roofing system was crucial before the new school year, which required extensive planning and coordination and an expedited schedule.
Everglades High School
Agency:
Broward County Public Schools
Year Completed:
2020
Scope of work:
The project involved HVAC improvements by replacing existing chillers with two new 400-ton chillers and installing a refrigerant leak detection system. The exhaust fans on the roof were also replaced, and new backdraft dampers were provided. The entire school was re-roofed, and a new lightning protection system was installed. The project was completed in multiple phases, three months ahead of schedule.
Pioneer Middle School
Agency:
Broward County Public Schools
Year Completed:
2020
Scope of work:
This project included re-roofing, installing a new acoustic ceiling and grid system, and installing HVAC enhancements. This included a new cooling tower, chiller, AHU, exhaust fans, kitchen exhaust hood, and exterior condensing unit. Ductwork and controls were replaced, and a fire sprinkler system was added. LED classroom lighting and electrical system upgrades were implemented. Renovations were extended to the Media Center, including new flooring, paint, and an acoustic ceiling, while bathrooms were made ADA-compliant. The project was phased to minimize disruptions during school activities.
Hollywood Central Elementary School
Agency:
Broward County Public Schools
Year Completed:
2022
Scope of work:
This project renovated multiple Buildings in phases while the school operated normally. It included re-roofing, door and window replacements, and HVAC upgrades such as chillers, pumps, AHUs, Fan Coil Units, exterior Condenser Units, and RTUs. Additionally, VAV boxes were replaced, controls transitioned to Direct Digital Controls (DDC), and new ductwork was installed. Interior upgrades featured acoustic ceiling replacements, lighting enhancements including energy-efficient LED fixtures, emergency lighting, and improved generator and switchgear.
Re-roofing of Three Schools
Agency:
Orange County Public Schools
Year Completed:
2023
Scope of work:
Sadler Elementary School - Consists of one and two-story buildings with existing modified bitumen and single-ply roofing systems. The approximate roof area for replacement is 29,300 SF of modified bitumen roofing on Building 1.
Windermere Elementary School -Consists of one and two-story buildings with existing modified bitumen and single-ply roofing systems. The approximate roof area for replacement is 32,500 SF of modified bitumen roofing on Building 1.
Windy Ridge K8 – Replace the existing single-ply roofing system on Building 200, approximately 6,900 SF.
Pioneer Park Elementary School
Agency:
The School District of Palm Beach County
Year Completed:
2021
Scope of work:
Work for this project included ADA and CSIR compliance, downspout replacement, intercom/sound system upgrade, fire alarm panel replacement, complete HVAC replacement, energy management system replacement, interior/exterior lighting replacement, parking lot paving, plumbing work, bathroom renovations, acoustic ceiling tiles replacement, and VCT flooring replacements.
Orchard View Elementary School
Agency:
The School District of Palm Beach County
Year Completed:
2023
Scope of work:
The scope of work included re-roofing building 1, HVAC replacement, interior finish replacement, doors and hardware replacement, lighting replacement (interior and exterior), bathroom renovations, boiler replacement, and fire alarm system upgrades.
Robles Elementary School
Agency:
Hillsborough County Public School
Year Completed:
2022
Scope of work:
The project involved replacing HVAC equipment throughout the school and significant interior finish replacement, including new flooring and ceilings, painting, a new walk-in freezer/cooler system, and select doors and frames replacement. The scope of work also included replacing major HVAC rooftop units, a 50-ton air-cooled chiller and associated pumps and tanks, a new make-up air supply unit for the kitchen, and minor landscaping. The project covered multiple buildings.
Georgia Jones-Ayers Middle School
Agency:
Miami Dade County Public Schools
Year Completed:
2021
Scope of work:
The project involved renovating the entire building's HVAC system. It included installing new rooftop units, pre-treatment AC units, and new ductwork. The project also upgraded the existing controls to new DDC controls and replaced electrical switchgear and ceiling light fixtures. The project was completed within budget and on schedule.
Lillie C Evans
K-8 Center
Agency:
Miami Dade County Public Schools
Year Completed:
2020
Scope of work:
The project involved a new two-story elevator building, restroom renovations, classroom flooring and painting, sidewalk and basketball court upgrades, MEP upgrades, and landscaping restoration. We completed it on time and within budget.
Cutler Bay Middle School
Agency:
Miami Dade County Public Schools
Year Completed:
2021
Scope of work:
Complete renovation of auditorium building: new seats, flooring, audiovisual system, stage lighting, curtains, and sound. Renovation of two groups of restrooms, new RTU units for the auditorium, new fire alarm, and MEP upgrades.
Dr. Gilbert Porter Elementary School
Agency:
Miami Dade County Public Schools
Year Completed:
2022
Scope of work:
Renovation of restrooms for ADA compliance, replacement of HVAC systems and EMS controls, demolition of a portable building, replacement of classroom cabinets, acoustical ceiling replacement, VCT patching around restrooms, exterior painting, and stucco repair, new doors for restrooms, replacement of exterior corridor ceiling, new roof flashing and caping, metal railings, basketball court resurfacing and striping, and replacement of drinking fountains.
Rainbow Park Elementary School
Agency:
Miami Dade County Public Schools
Year Completed:
2020
Scope of work:
The project involved replacing mechanical equipment, installing new unit ventilators and ceiling grids/tiles, and upgrading DDC controls throughout the school. A new voice-activated addressable fire alarm system, light fixtures, and fire sprinkler system were installed. The construction work covered various areas of the school and was phased carefully to minimize disruption to ongoing school activities. The project also included upgrades to the media center and ADA restroom renovations.
Cypress Lake High School
Agency:
The School District of Lee County
Year Completed:
2021
Scope of work:
Single point entry Cypress Lake High School. Single point entry Orangewood Elementary School:
Our Clients
Certificates, Licenses & Affiliations
State of Florida
Minority Business Enterprise
State of Florida
Certified General Contractor
State of Florida
Certified Roofing Contractor
Minority Business Development Agency
Green Building Council
Society of American Military Engineers (SAME)
American Society for Health Care Engineering (ASHE)
Associated Builders and Contractors of Central Florida